Transformer Shrink Wrapping
Heat-shrunk, drum-tight covers for power and distribution transformers — sealed around bushings, radiators and accessories without trapping moisture.
Learn more
Armstrong Shrink Wrap seals transformers, switchgear and critical industrial equipment in tough, drum-tight heat shrink film — shielding your assets from weather, dust and corrosion during transport, storage and outages.
From a single transformer to an entire substation shipment, our crews wrap, seal and band equipment so it arrives — and stays — in factory condition.
Heat-shrunk, drum-tight covers for power and distribution transformers — sealed around bushings, radiators and accessories without trapping moisture.
Learn moreCustom-fit protection for switchgear, generators, turbines, HVAC units and oversized machinery of any shape or size.
Learn moreExport-grade wrapping that survives road, rail and ocean freight — with banded reinforcement and vented moisture control for long hauls.
Learn moreMulti-year outdoor preservation with UV-stable film, VCI corrosion inhibitors and desiccant systems for mothballed or staged assets.
Learn moreInspection, cleaning, paint touch-up and accessory checks performed while your unit is staged — so it energizes right the first time.
Learn moreTrained, harnessed and insured technicians who mobilize to your plant, yard, port or substation — anywhere in the continental US.
Learn moreTarps flap, leak and fail. Heat shrink wrap forms a sealed second skin that stays tight through wind, rain, road vibration and months of outdoor exposure.
A proven four-step process keeps your schedule intact and your equipment protected — with zero disruption to surrounding operations.
We survey your equipment, site access and timeline, then specify the right film gauge, venting and banding plan for the job.
Sharp edges are padded, bushings and accessories are cushioned, and moisture control is placed before a single sheet goes on.
Certified technicians shrink the film drum-tight with controlled heat, welding seams and banding stress points for transport.
Every wrap is inspected, photographed and documented before we hand it back — ready for shipping, storage or energization.
A look at recent transformer and equipment protection projects completed by our crews in the field.
Armstrong's crew wrapped fourteen units in two days without slowing our floor down once. Every wrap came out tight, clean and inspection-ready.Operations Manager Transformer manufacturing facility, US East Coast
Tell us what you need wrapped, where it is and when it ships. We'll come back with a clear plan and a fixed quote — usually within one business day.